|
STUDY AREA
- The characterization encompasses the entire length of the Arroyo Alamar rehabilitation project,
from its upstream end at the bridge over the Tecate toll road to its downstream end about 10 km downstream,
to connect with the Second Phase of the Rio Tijuana.
-
This includes three distinct sections:
- From the bridge at the Tecate toll road to the bridge at Boulevard Héctor Terán
Terán.
- From the bridge at Boulevard Terán Terán to the bridge at Boulevard Manuel J. Clouthier.
- From the bridge at Boulevard Clouthier to the end of the Second Phase of the Rio Tijuana.
|
|